ARCHITECTURAL PROJECTS
PUBLIC
19 July, 2009
HOTEL MOD05
A living “facade” is what brings harmony to the building witch lives in tune with the building’s inhabitant.
(Enrica Mosciaro-fusina6)
project: Enrica Mosciaro
partners: Katerina Samsarelou, Nuria Valldeneu, Jordi Castel
frame: Marino Gavasso
installations: Studio Quattrina
management of construction site: Andrea Aloisi, Enrica Mosciaro
client: Italgestioni spa
location: Sandrá di Castelnuovo del Garda, Verona
chronology: january 2000 - december 2004 (project), january 2005 - december 2007 (realization)
allotment: 3.337 sqm
constructed surface: 3.002 sqm
volume: 5.800 cm
photographs: Ciro Frank Schiappa
The Hotel Mod05 configured itself as the overlap of two buildings, divided without touching each other by a large stripe of glass. The compact but light volume of the rooms floats on the complex and articulated ground floor.
The ground floor builds itself around a glassy central place which brings together different functions: The reception, the office, the bar, the restaurant, the meeting room and the kitchen.
The hall develops itself around these volumes always allowing the exterior and the sky to be viewed.
The matter strength of the volumes is highlighted by the treatment of the surface and the continuity of the finishing and the contrast of colors of the interior and the exterior.
The volume where the rooms are placed dematerializes itself: a second wood facade lets the light to be modulated into the interior of the rooms, selecting the view and regulating the solar flow during the different seasons of the year.
In the hotel change always take place, in every room, every hour of the day, at every moment.
Materials:
Internal floor ground floor: ceramic Graniti Fiandre “pietra serena”
External floor ground floor: ceramic Graniti Fiandre “pietra basaltina”
Internal floor first and second floor (rooms): oak wood (Prea s.r.l)
External floor first and second floor (rooms): metallic grid
False ceiling ground floor: Topakustik® panels of medium density, color black
False ceiling first floor (rooms): plaster
ground floor walls: colored brick wall
first and second floor walls (rooms): FERMACELL gypsum fibre board
external carpentry: aluminium
access door (ground floor): oak wood
internal carpentry: oak wood
bar counter and reception counter: artificial stone, color brown
bar and reception’s clapboard: oak wood
brise-soleil facade: Meteon Trespa panels in three different colors on metallic structure
Internal furniture: Moroso, Arper
External furniture: Santacole Graphic design: Sebastiano Zanetti, Studio Contemporaneo
Lightening: Viabizzuno
Bathrooms:
Duravit (toilet y bidet: starck 3, sink: vero)
Kaldewei (shower and bathtube)
Grohe (faucet: essence)
covering: Graniti Fiandre brown color
Contemporary Architecture Work – Presentation of Architecture Projects
Greekarchitects.net as the English version of Greekarchitects.gr represents the work of Architects worldwide in its pages. (Invitation for participation)
Related articles:
- Inhabiting the landscape ( 02 March, 2011 )
- “Youth hostel in central Athens” ( 19 November, 2011 )
- Landscape architecture : hotel renovations ( 09 February, 2012 )
- Alma hotel ( 15 October, 2014 )
- Gkazi hostel ( 11 February, 2013 )
- Ecotourism centre - marine park facilities in island "Kelyfos" ( 17 January, 2014 )
- Tourist facilities in Variko, Litochoro ( 25 May, 2014 )